User Guide

26
In the below example, Sunday and Monday are linked, so any blocks that are added or removed
for Sunday will automatically and immediately reflect the same for Monday and vice versa:
8. Another way to configure recording schedules is by using setting the time periods. Click
the ‘gear’ icon to the far right of any day to open the Period page:
Here, the periods (Periods 1 - 6) must be in specified in chronological order. You can set either
General, MD, or both with the checkboxes to the right. You can also copy the period settings
over to other days by checking them individually or checking All. Make sure to click OK when
finished.
9. Now that you’ve finished configuring the recording schedules, you may need to copy
these settings over to another channel (or camera). By default, Channel 1 will be selected when
you visit this page. Unless you immediately selected All in the channel window from step 4
above, note that you can copy these settings directly over to another channel by clicking Copy
down below: