Assembly Instruction

apex tower
assembly instructions
Page 5 of 69756131/9756149- 01/13/09
4. Once you have decided where to put your apex tower you must install the hanging hardware. Set the
tower into  nal position against the wall. Make sure it is level and sitting  ush on the  oor. Make a small
mark at the top and the sides of the top. You will have to measure from these marks. Move the tower unit.
Measure the distance from the end of the side rail to the center of the hole. Now measure over from your
mark the same distance. Make another mark. Measure down from the top of the top rail to the center
of the same hole. Now measure down from the top mark this distance and make a cross mark over the
1st mark. Repeat on the other side.
Mark here on wall
Mark here on wall
Mark here on wall
1
2
1
2
1
1