RDF System Management Manual
Table Of Contents
- RDF System Management Manual
- What’s New in This Manual
- About This Manual
- 1 Introducing RDF
- RDF Subsystem Overview
- RDF Processes
- RDF Operations
- Reciprocal and Chain Replication
- Available Types of Replication to Multiple Backup Systems
- Triple Contingency
- Loopback Configuration (Single System)
- Online Product Initialization
- Online Database Synchronization
- Online Dumps
- Subvolume- and File-Level Replication
- Shared Access DDL Operations
- EMS Support
- SMF Support
- RTD Warning Thresholds
- Process-Lockstep Operation
- Support for Network Transactions
- RDF and NonStop SQL/MX
- Zero Lost Transactions (ZLT)
- Monitoring RDF Entities With ASAP
- 2 Preparing the RDF Environment
- 3 Installing and Configuring RDF
- 4 Operating and Monitoring RDF
- 5 Managing RDF
- Recovering From File System Errors
- Handling Disk Space Problems
- Responding to Operational Failures
- Stopping RDF
- Restarting RDF
- Carrying Out a Planned Switchover
- Takeover Operations
- Reading the Backup Database
- Access to Backup Databases in a Consistent State
- RDF and NonStop SQL/MP DDL Operations
- RDF and NonStop SQL/MX Operations
- Backing Up Image Trail Files
- Making Online Dumps With Updaters Running
- Doing FUP RELOAD Operations With Updaters Running
- Exception File Optimization
- Switching Disks on Updater UPDATEVOLUMES
- 6 Maintaining the Databases
- 7 Online Database Synchronization
- 8 Entering RDFCOM Commands
- 9 Entering RDFSCAN Commands
- 10 Triple Contingency
- 11 Subvolume- and File-Level Replication
- 12 Auxiliary Audit Trails
- 13 Network Transactions
- Configuration Changes
- RDF Network Control Files
- Normal RDF Processing Within a Network Environment
- RDF Takeovers Within a Network Environment
- Takeover Phase 1 – Local Undo
- Takeover Phase 2 – File Undo
- Takeover Phase 3 – Network Undo
- Takeover Phase 3 Performance
- Communication Failures During Phase 3 Takeover Processing
- Takeover Delays and Purger Restarts
- Takeover Restartability
- Takeover and File Recovery
- The Effects of Undoing Network Transactions
- Takeover and the RETAINCOUNT Value
- Network Configurations and Shared Access NonStop SQL/MP DDL Operations
- Network Validation and Considerations
- RDF Re-Initialization in a Network Environment
- RDF Networks and ABORT or STOP RDF Operations
- RDF Networks and Stop-Update-to-Time Operations
- Sample Configurations
- RDFCOM STATUS Display
- 14 Process-Lockstep Operation
- Starting a Lockstep Operation
- The DoLockstep Procedure
- The Lockstep Transaction
- RDF Lockstep File
- Multiple Concurrent Lockstep Operations
- The Lockstep Gateway Process
- Disabling Lockstep
- Reenabling Lockstep
- Lockstep Performance Ramifications
- Lockstep and Auxiliary Audit Trails
- Lockstep and Network Transactions
- Lockstep Operation Event Messages
- 15 NonStop SQL/MX and RDF
- Including and Excluding SQL/MX Objects
- Obtaining ANSI Object Names From Updater Event Messages
- Creating NonStop SQL/MX Primary and Backup Databases from Scratch
- Creating a NonStop SQL/MX Backup Database From an Existing Primary Database
- Online Database Synchronization With NonStop SQL/MX Objects
- Offline Synchronization for a Single Partition
- Online Synchronization for a Single Partition
- Correcting Incorrect NonStop SQL/MX Name Mapping
- Consideration for Creating Backup Tables
- Restoring to a Specific Location
- Comparing NonStop SQL/MX Tables
- 16 Zero Lost Transactions (ZLT)
- A RDF Command Summary
- B Additional Reference Information
- C Messages
- D Operational Limits
- E Using ASAP
- Index
Messages
HP NonStop RDF System Management Manual—524388-003
C-113
RDFCOM Messages
As one of its validation checks during START RDF processing, RDFCOM tries to
create a temporary image file on the receiver’s RDFVOLUME and then to allocate all
16 extents. This check, if successful, verifies that:
•
If RDF is starting for the first time, there is enough storage for at least one image
file
•
If RDF has been started previously, there is enough storage for one image file
when the next image-file rollover occurs
If the check fails because there is insufficient storage, this message appears.
Effect. The START RDF command is aborted.
Recovery. Refer to the Operator Messages Manual for a description of the error code.
For additional details about understanding and correcting file-system errors, see the
Guardian Procedure Errors and Messages Manual. Make sufficient space available on
disk, and then reenter the START RDF command.
error#
is the file-system error number that identifies the specific error.
Cause. During execution of a START RDF command or a VALIDATE
CONFIGURATION command, RDFCOM determined that sufficient disk storage for
image files did not exist on the RDFVOLUME. As one of its validation checks during
processing of these commands, RDFCOM tries to create a temporary image file on the
receiver’s RDFVOLUME and then to allocate all 16 extents. This check, if successful,
verifies that:
•
If RDF is starting for the first time, there is enough storage for at least one image
file
•
If RDF has been started previously, there is enough storage for one image file
when the next image-file rollover occurs
If the check fails because there is insufficient storage, this message appears.
Effect. The command fails.
Recovery. Refer to the Operator Messages Manual for a description of the error code.
For additional details about understanding and correcting file-system errors, see the
Guardian Procedure Errors and Messages Manual. If possible, correct the error and
reenter the command that encountered the error. Otherwise, see your system
manager.
RECEIVER RDFVOL error error# on creation